Wall Crack Filler

Poor building process It's possible for the mason to be in a haste, or build a wall when conditions are not proper. He might not prepare adequately for the conditions he is working in. He may throw lots of junk in the trench by the walls as it's being built, and that can create issues later on. He may put the wrong size sill plate on the wall, creating lateral pressure on the wall, or he might backfill too soon after building the wall, while the concrete is still curing .

TOP